you need a bushing on that pipe. and generally speaking you cant use a panel as a raceway (the red black white going from top to bottom)

mdxchaos

Please read the rules of the sub for the reason your post was removed, Violation of Rule #1.

mdxchaos

as /u/N9bitmap said, first thing is its good you woke up. but problems from shocks can linger. especially muscle damage. when i got schocked and ended up in hospital on an EKG, my heart was fine but the docs told me to be on the lookout for brown urine. thats your muscles dying and can turn in to sepsis. i would recommend getting checked out. probably nothing, but is it really worth it?

mdxchaos

you know just enough about motors and wiring to be a danger to yourself, or the next guy

mdxchaos

Canada?

soldiered connections are not allowed on 120v must be crimped

mdxchaos

only need 1 rule: no

mdxchaos

the protective armor of AC/BX is not considered an effective ground path

mdxchaos

sorry to be that guy, but not all states have battery. its just assault

mdxchaos

my dad was a fucking douchebag.... i'll say it loud and proud.

mdxchaos

she only won by 3k votes in calgary... IN MY FUCKING RIDING... you wanna know how distasteful that is for me?

shes a fucking wench

mdxchaos

we did once..... but then everyone got butthurt because it helped people

mdxchaos

you have a valid point, and i'd have to agree with you

mdxchaos

"team smith" can go fuck herself right now

mdxchaos

oh right... the totals were above 100% not him per say.

mdxchaos

for that many kids? abso-fucking-loutly

mdxchaos

has been for 20+ years

mdxchaos

Didn't putin get 124% of the votes?

mdxchaos

this is British Columbia ya fucking yank

mdxchaos

the union does not exists in my city, but yeah, we would be way more expensive to do it ourselves then to hire it out to ppl who know how to move big heavy shit

mdxchaos

in 18 years, the company's ive worked for have always hired out to set switchgear. not worth the trouble. especially when you watch them tip it over and destroy it.

mdxchaos

first, call the utility. you need to find out if they will even serve you 600a. if they do great, ask them what they require. get a list. then call an electrical company and tell them what you want to do. they will come out and look and see what it will take with the list of requirements you got from your utility. then, go from there

mdxchaos

-Do I need to replace the wires feeding the existing panel to upgrade?

depends. you can get a 200a panel and just put a 100a breaker in it and not change the wires. or you could possibly have to change the wires if you want the full 200a. you would also have to make sure the lugs you have can accept being double tapped with the size of wire

mdxchaos

that really does not look like it would be causing any issue, the contact point is much higher on the pin then the break

mdxchaos

30-412:

No. 14 AWG copper tap connection insulated conductors shall be permitted for a single luminaire, and for luminaires mounted in a continious row as specified in rule 30-310 1). on a branch circuit protected by an overcurrent device rated or set at 20A, provided that the tap connection insulated conductors

a) have an ampacity not less the the rating of the single luminaire or the luminaries mounted in a continious row as specified in rule 30-310 1); and

b) do not exceed 7.5m in length.

mdxchaos

cec 30-412

perhaps its you who is talking out their ass